The Project:

Statutory design for a pilot project, interim and permanent installations.

Solid pre- and post-sifting transport systems will be designed at the facilities, including reservoirs for various fractions, conveyors and sieves, and design activity for earthworks, concrete foundations and required steel constructions based on our soil report.