top of page
Project:
Improving the incineration process (1,100° C) in the hazardous waste treatment facility through the construction of a HAZMAT incinerator at the Ecosol plant in Naot Hovav.
Client Benefit:
The output of the hazardous materials incinerator has been increased both in terms of capacity and the amount of steam produced from surplus energy.
The project was carried out while meeting a predefined limitation of the ongoing work shutdown time specified for construction.
Gallery
bottom of page