A Description of the Project:
Increasing solid transport capacity while addressing non-focal dust emissions.
Construction design for a 45-meter-high tower and bridges for conveyors in apertures up to 80 meters, including reinforcement of an existing transit tower and construction of a surplus silo of finished material from distribution conveyors and a tanker filling station.
Client benefit:
Conveyor belt output was increased as part of the process of renewing outdated equipment, while adhering to up-to-date dust emission standards, protecting the environment and worker safety at the facility.
As part of the project, reinforcements were designed for the building to ensure compliance with the latest standards for loads and earthquakes.