top of page
The Project:
Upgrading chlorination facilities at three locations along the National Water Carrier
Client benefit:
The equipment and most disinfection systems have been operating at Mekorot for more than 30 years. As part of the project, the replacement of the entire equipment, plumbing, electrical systems and command and control systems was planned and carried out.
Gallery
bottom of page