Project Description: 

Due to the need to adapt its existing facilities to changing production requirements, Intel sought to create a "clean passageway" connecting two existing manufacturing facilities in a "Class 1 Clean Room" environment. As part of the project, the clean passage, designed in collaboration with Intel entities abroad, was prefabricated and installed at the site as part of a complex engineering operation that required coordinated activity by construction engineers, quality controllers and foremen on behalf of E. Taieb Engineering.

Benefit to the client: 

As part of our worldview, we see precise engineering work as the key to saving time, labor, and material costs. Therefore, in this project, emphasis was placed on working according to plans and planning the time without delays and in perfect coordination between the parties involved.